- Phone
-
Address
7F, Building E, Huating Jiayuan, No. 6 North Fourth Ring Middle Road, Chaoyang District, Beijing
Beijing Zhongke Ke Er Instrument Co., Ltd
7F, Building E, Huating Jiayuan, No. 6 North Fourth Ring Middle Road, Chaoyang District, Beijing
| L/S Easy-Load ® 3 Easy to Install Type 3 Pump Head Model: 77800-xx |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Features: Place of OriginUnited States No tools or installation accessories are required when installing and stacking pump heads - the pump tube is automatically positioned, making installation and replacement more convenient ■ Rotary lock installation, the entire installation and stacking process only takes a few seconds The Easy Load 3 pump head adopts an automatic positioning mechanism design, making the installation and removal of pump pipes more convenient than ever before. Just open the pressure rod to open the bite bed, and at the same time, turn on the pump The tube is fed into the pump tube locator and accurately positioned. Close the pressure rod and start the pump - the locator will automatically clamp the pump tube and firmly fix it. Apply the optimal bite force to the bite bed, and a wider bite angle can prevent liquid backflow when the pump tube reaches the rated pressure (see specifications in the table below) The rotor has a 30 ° roller/shaft offset adjustment function - it can unify the channels from the stacked pump head, greatly reducing pulsation. Random equipment: installation panel/adapter suitable for L/S drive, one 43cm long silicone tube. The pump head can be directly installed onto the driver. L/SEasy-Load®3cross-dressing3typepump headParameters and ordering guide
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||