The integrated rainwater lifting pump station is an essential helper in urban drainage systems. Its main function is to provide power for rainwater and accumulated water on urban areas and roads through pipelines, transporting rainwater and water from municipal pipelines to discharge or treatment sites. Urban rainwater and sewage often mix with various solid waste such as tree branches, leaves, plastic bottles, etc. when passing through municipal pipelines. The accumulation of a large amount of solid waste can cause blockages in the pipeline network. Therefore, integrated rainwater lift pump stations are often equipped with crushing grids to pre treat these solid wastes. The crushing grid is equipped with sharp stainless steel blades, so solid waste can be easily crushed into small solid particles through a water pump, and finally enter the treatment plant with rainwater and sewage for further processing.
structure
The integrated rainwater lifting pump station mainly consists of fiberglass cylinder body, anti slip cover, pump station cover, supporting sewage pump, service platform, liquid level sensor, intelligent control system, various valves and pipelines, bottom dredging and anti floating system.
Advantages:
A、 It has a very long service life, which can reach more than 30 years (because GRP fiberglass is non degradable, will not corrode or deform, and the inner wall is smooth and does not attach anything);
B、 It has a very small volume, with a diameter of usually two to three meters, buried underground, and only occupies a few square meters on the surface, which is very space saving;
C. U-shaped bottom design, with almost no sediment settling, eliminating the trouble of cleaning;
D、 Automatic control, different from traditional pump stations that require personnel to guard;
E、 The integrated installation is completed and shipped directly from the factory. The on-site installation is simple, and the inlet and outlet flanges can be directly connected;
F、 Short construction period