KS3000-CZ Inflatable Cabinet Fully Automatic Moisture Removal System
This product has applied to the China National Intellectual Property Administration and obtained a patent
The software department has applied for a software product certificate from the Shanghai Software Association
Apply for a computer software copyright registration certificate from the National Copyright Administration
Please do not imitate.
The main functional features of this plan are:This scheme is applicable to the removal of moisture during the production process of 10-35KV SF6 gas filling cabinets, and there are differences in equipment schemes such as environmental protection cabinets;
This solution can quickly and automatically remove micro water in one go, achieve moisture standards, and automatically print moisture test values;
Workflow of this plan:After the detection of the (helium) vacuum box is completed, fill SF6- exit the (helium) vacuum box - connect the equipment pipeline - measure the initial micro water - recover the gas chamber to the set value - open the inflation pipeline - recharge to the set pressure value - open the recovery pipeline to recover to the set value - repeat this cycle - micro water test - test qualified - inflate to the factory pressure value - use indicator lights or alarm lights to remind completion - automatic printing - remind the micro water treatment is completed and the pipeline is removed;
If the inflatable cabinet has two interfaces:
The process is as follows: After the helium vacuum box inspection is completed, fill SF6- exit the helium vacuum box - connect the equipment pipeline - SF6 is recovered from the outlet - micro water automatic testing - filter moisture - recharge from the inlet - repeat this cycle - micro water automatic testing - pass the test - inflate to the factory pressure value - use indicator lights or alarm lights to remind completion - remind printing - print data - next machine; After each cycle, the micro water value can decrease by about half until the micro water value measured at the outlet is lower than the set value. Then run another cycle, and after the run, it will automatically print
If the inflatable cabinet only has one interface:
The process is as follows: After the helium vacuum box inspection is completed, fill SF6- exit the helium vacuum box - connect the equipment pipeline - SF6 is recovered from the gas port - micro water automatic testing - moisture filtration - recharge - recover - micro water automatic testing - test qualified (if unqualified, continue to cycle) - fill to the factory pressure value - use indicator lights or alarm lights to remind completion - remind printing - print data - next machine; Before recharging, the solenoid valve needs to repeatedly switch the pipeline. The micro water value can be reduced by half every cycle until the micro water value measured at the outlet is lower than the set value, and then run another cycle. After running, it will automatically print.
System CompositionGas drying and filtering module, micro water testing module, vacuum and compression module, pipeline, solenoid valve, microcomputer fully automatic control module;
Gas drying and filtering module:The equipment includes a set of moisture drying and filtering devices, a set of drying module resurrection devices, and a pressure adjustable system.
Pressure adjustable system: within the designed pressure range, it can be set through a microcomputer;
Drying module revival device: If it is detected that the drying module is absorbing moisture close to saturation, the page prompts the operator and automatically starts the drying module revival process according to the operator's instructions.
In order not to affect work efficiency, the drying module resurrection device should be turned on during non working hours as much as possible.
Moisture drying and filtering device, when the recovered gas passes through the device, water molecules and particulate impurities are filtered, and SF6 can pass through.
Micro water testing moduleImported sensors are embedded in the system pipeline, and micro water test data is displayed on the touch screen; , can display the micro water during recycling and refilling;
Vacuum pumping and compressor moduleRecover the gas inside the chamber into this equipment, dry it, and then recharge it back into the chamber; After the completion of micro water treatment, the pressure in the air chamber is maintained at the factory pressure value.
Control section: 10.1‘
1. The maximum inflation pressure for the drying process can be set; Can set the inflation pressure for factory delivery;
2. Can set the minimum pressure for recycling;
3. Accurately obtaining pressure values through pressure sensors;
4. The following information can be output through methods such as printer (default), USB output (optional), remote transmission (optional), etc.: company name, product each time, date, product number, operator ID, micro water value;
General Technical Parameters
| serial number |
project |
Technical Specifications |
|
1 |
Dimensions (LBH) |
1620*950*1350 |
|
2 |
Weight (Kg) |
<=500 |
|
3 |
power supply |
AC220 |
|
4 |
Power (Kw) |
<=5 |
|
5 |
One activation absorption water content (Kg) (<30ppm) |
>=1.0 |
Moisture removal effectThe following data is real-time detection data
Taking the 600L test product as an example, a micro water value of 60ppmv is set as qualified. Equivalent to about 3-4 intervals
| Time consumption (min)<= |
Initial micro water value (ppm) |
|
65 |
10000 |
|
50 |
5000 |
|
30 |
1000 |
|
22 |
600 |
|
15 |
300 |
Single compartment gas cabinet, with a chamber size of approximately 160L (this data is an actual test value from a customer for reference)
| Time consumption (min) |
Initial micro water value (ppm) |
End micro water value (ppm) |
|
20 |
700 |
12 |
|
27 |
1100 |
10 |
Configuration List
| serial number |
name |
Model |
quantity |
Remarks |
|
1 |
Fully automatic moisture removal system for inflatable cabinets |
KS3000-CZ |
1 |
|
|
2 |
Connect the self sealing pipeline and joint to the inflation cabinet |
Set (2 meters) |
1 |
Customize self sealing valve according to the product connector of the demand side |
|
3 |
Connect the self sealing joint with a 40L gas cylinder |
set |
1 |
Customized according to different specifications of the demand side |
|
4 |
printing paper |
roll |
2 |
|
|
5 |
Instruction Manual |
this |
1 |
|
|
6 |
Certificate of Conformity |
page |
1 |
|
Customization instructions:
To improve efficiency, this device can be customized as a one to two or one to many device;



KS3000-CZ that has already achieved mass production
The following is an on-site debugging training provided by a certain client company. Please feel free to inquire.
June 23-24, 2020 Wenzhou, Zhejiang

field equipment

10KV gas filling cabinet


Fully automatic operation, one click completion
|
|
Micro water meter verification
|
After removing moisture, use a micro water analyzer to verify, 4ppm, stunning effect!
|
|
On site debugging video 1
|
Factory finished or semi-finished equipment, welcome to make an appointment for trial.